BECAUSE IT SHOULD BE SIMPLE.
Your digital partner in Switzerland+41 44 552 43 66info@irontec.ch
Irontec
UniFi Switches & Switching

Ubiquiti UniFi switches: from offices to campuses

Ubiquiti UniFi switches for Swiss SMEs and campuses: PoE, multi-gigabit, fiber optic uplinks, VLANs, aggregation and stacking, clearly planned and supported.

UniFi PoE & Multi GigabitFiber & AggregationStacking & Redundancy

Ubiquiti · View product details ↗

Networking & SecurityWith Irontec at your side.
What it's about

UniFi Switches & Switching.
With an eye on your everyday life.

A switch connects workstations, servers, access points and cameras to the rest of the network. In order for the connection to be suitable in everyday life, in addition to the number of ports, speed, PoE performance and uplinks also count. Irontec plans UniFi switching for small offices to multi-tier campus networks. We explain the differences between access switches, aggregation and WAN switches and coordinate hardware, cabling and operations for your location.

The right connectionsConsider end devices, data rate and free ports together.
Power supply with reserveCheck PoE standard per port and total power budget.
Clear network structureDocument access level, aggregation and alternative routes in a comprehensible manner.
This is in our performance

Thoughtfully planned.
Personally implemented.

Choose the building blocks that suit your initial situation. We determine the scope and support together.

UniFi port planning

Record workstations, access points and cameras in a port list. Consider reserves for new devices and the required data rate.

UniFi PoE supply

PoE supplies suitable end devices via the network cable. We check the required standard and the common budget of all occupied ports.

UniFi Uplinks & Fiber Optic

Connect floors, servers and distributors with suitable uplinks. Port types, optics, cable length and remote stations must match.

UniFi VLANs & port profiles

Assign network areas for company devices, guests and cameras. Releases between areas are coordinated with routing and firewall.

UniFi stacking & MC-LAG

Select the supported redundancy functions specifically. A stack of individual switches in a rack is not a logically managed switch stack.

UniFi Operation & Monitoring

Document port assignment and connections. Malfunctions, extensions and updates can be processed and tracked in a targeted manner.

Suitable for the size of the application

Switching from the office to the campus.

From the compact PoE switch to stacked access switches and redundant aggregation.

Ubiquiti Lite 8 PoE

Small businesses

Lite 8 PoE

Connect a few devices and PoE consumers via gigabit. The number of ports and the shared power budget limit the expansion.

CHF 112.16Guide price per device excluding VAT · exact price on request
Product details →
Ubiquiti Pro Max 16 PoE

Medium-sized companies

Pro Max 16 PoE

Combine Gigabit and 2.5 GbE devices, with fast SFP+ uplinks to the rest of the network. Plan PoE reserve for access points and cameras.

CHF 406.72Guide price per device excluding VAT · exact price on request
Product details →
Ubiquiti Enterprise Campus 48S PoE

Large companies & campuses

Enterprise Campus 48S PoE

ECS-48S-PoE as access level, ECS Aggregation as higher connection level. Maximum of four ECS-S switches per stack; Plan redundant connections separately.

CHF 4'077.38Guide price per device excluding VAT · exact price on request
Product details →

The examples are planning recommendations, not fixed capacity limits or complete packages. CHF indicative pricing per device pictured; exact price on request. All models in the following comparison have their own detail pages.

View all UniFi products →
Ubiquiti UniFi

The right hardware.
Directly compared.

A selection of important products for your project. Irontec tailors devices, setup and ongoing support to your needs.

Hardware guide prices in CHF, excluding VAT, shipping, any import taxes and setup. Product price status: September 15-16, 2026. Conversion: 1 EUR = CHF 0.9441 (ECB, September 15, 2026). Exact price on request. We will confirm availability and total price with your offer. Course source

Switching: Size the connections and PoE appropriately

The number of ports alone is not enough. Data rate, power budget and connections to the rest of the network must match.

Switching: Size connections and PoE appropriately: products, features and guide prices
productUbiquiti Lite 8 PoELite 8 PoEUSW-Lite-8-POE-EUUbiquiti Pro Max 16 PoEPro Max 16 PoEUSW-Pro-Max-16-PoE-EU
Area of applicationSmall installations with a few PoE devicesGrowing offices with cameras and fast access points
Network ports8 × Gigabit, of which 4 × PoE+12 × Gigabit PoE+, 4 × 2.5 GbE PoE++
Fast uplinksVia gigabit ports2 × 10G SFP+
PoE budget52 W total180 W total
To be taken into accountFanless; no 2.5-GbE portsRack mounting requires separate accessories
Guide price excluding VATCHF 112.16per device · exact price on requestCHF 406.72per device · exact price on request
DeliverabilitySold out from the manufacturer at the current priceOn request
Find out moreProduct details →Inquire about product ↗Manufacturer details ↗Product details →Inquire about product ↗Manufacturer details ↗

Campus switching and WAN: Separate tasks in a targeted manner

Access ports, aggregation and Internet handover fulfill different tasks. The components are planned as a coherent topology.

Campus switching and WAN: Separate tasks in a targeted manner: products, features and target prices
productUbiquiti Enterprise Campus 48S PoEEnterprise Campus 48S PoEECS-48S-PoE-EUUbiquiti Enterprise Campus AggregationEnterprise Campus AggregationECS-Aggregation-EUUbiquiti WAN SwitchWAN SwitchUSW-WAN-EUUbiquiti UniFi 5G MaxUniFi 5G MaxU5G-Max
Area of applicationLarge access networksAggregation for large locationsInternet handover to a gateway pairAdditional internet route
task48 PoE ports: 16 × 10 GbE and 32 × 2.5 GbEBundling connections between the access level and gateways3 × 10G SFP+: Internet connection and two gateways5G backup via UniFi LAN
AvailabilityUp to four ECS-S devices per stack; two power suppliesMC-LAG as a pair; redundant power suppliesTwo AC inputs; one switch per providerA single modem is not a redundant pair
Planning950 W PoE budget in redundant 230-V operationCoordinate optics, uplinks and port assignmentCheck provider handover and gateway compatibilityTest reception, SIM/eSIM, data volume and failover
Guide price excluding VATCHF 4'077.38per device · exact price on requestCHF 4'077.38per device · exact price on requestCHF 254.91per device · exact price on requestCHF 406.72per device · exact price on request
DeliverabilityOn requestOn requestOn requestOn request
Find out moreProduct details →Inquire about product ↗Manufacturer details ↗Product details →Inquire about product ↗Manufacturer details ↗Product details →Inquire about product ↗Manufacturer details ↗Product details →Inquire about product ↗Manufacturer details ↗

Wi-Fi coverage and performance depend on building, device and configuration. EU devices may require a suitable Swiss connection cable. Optional accessories, data carriers and additional paid services are only included if expressly stated.

This is how the solution can help

Thought from your everyday life.

Example situations – we tailor the specific implementation to your requirements.

01

Small office with few PoE devices

A compact UniFi switch connects workstations and selected devices. We check whether the gigabit connection and power budget match the actual needs.

02

Growing company with WiFi 7 and Protect

Fast access points and cameras require different ports and power reserves. We create an occupancy plan and coordinate uplinks with the next network level.

03

Campus with multiple distributors

Access switches are connected via planned aggregation. Suitable stacks, replacement paths and separate power supplies are set up and tested together.

Good to understand

Select the number of ports and speed together

Eight free sockets are of little help if the type of device required requires a faster connection or a different PoE standard. We differentiate between wired workstations, access points, cameras and servers. Example: In the office, gigabit ports may be sufficient for individual devices, while fast access points require suitable 2.5 or 10 GbE ports. In addition, uplinks and reserves for expansions are planned.

PoE: Performance per port and budget for the entire switch

PoE delivers data and power via one cable. Two pieces of information are crucial: the supported performance on the individual port and the total available PoE budget. Planning example: Four consumers with 25 W each result in a total of 100 W before additional reserve. A switch with a total budget of 52 W is not enough for this, even if all devices can be physically connected. We examine the performance requirements of each device type and the intended power supply operation.

Uplinks, SFP modules and fiber optics explained

An uplink connects a switch to the next network level. If many fast connections share a slow uplink, a bottleneck can arise there. SFP-based connectors require appropriate modules or direct connection cables; Form factor, speed and remote device must be compatible. We plan building connections and server connections based on the required range and expected data traffic.

Access, aggregation and WAN perform other tasks

Access switches provide the connections for end devices. Aggregation bundles connections from multiple distributors or floors. A WAN switch has its own role at the Internet gateway, for example to pass on a provider connection to a gateway pair. These devices are not interchangeable sizes of the same product. The comparison shows their respective uses, and the network overview combines them into complete equipment suggestions.

Stacking, LACP and MC-LAG differ

LACP combines compatible connections into one logical connection; This does not automatically make a single data stream faster by the number of cables. For supported ECS-S switches, stacking connects multiple devices into a jointly managed unit. ECS Aggregation can provide redundant connections as a MC-LAG pair. We select the function according to remote stations and failure requirements. Current campus planning uses three stacks of four for twelve access switches.

Redundancy also requires power paths and tests

Two power supplies only help in the intended operating mode and with a suitable power supply. For the ECS-48S-PoE, Ubiquiti states a PoE budget of 950 W for 200-240 V in redundant operation; Operating both power supplies together has a different budget. We plan reserves based on the desired failure event. Acceptance includes separate tests for switch, uplink and current path – with the agreed expectations in each case.

Your UniFi project with Irontec

What does UniFi switch planning include?

We record the required ports, data rates and PoE devices. This forms the basis for a port plan, uplink design and equipment selection. VLAN assignments, links between distribution points and planned backup paths are documented. Redundancy is checked for the specific combination.

For the initial consultation

  • Sites, floor plans and existing equipment
  • Workstations, applications and current bottlenecks
  • Target date and outage requirements

A clear quotation

You receive an agreed scope covering hardware, setup and optional support. Product pages show indicative CHF prices; the final quotation takes your site into account.

Discuss your UniFi project ↗
This is how we get to the result

A clear process.
From the beginning.

We arrange analysis, implementation and ongoing support based on your location. You will receive a comprehensible offer and the agreed documentation.

01

Capture connections

Include devices, cabling and performance requirements.

02

Plan topology

Set switches, port assignment, VLANs and connections.

03

Set up & check

Accept configuration and test data and power supply.

04

Hand over & accompany

Document port plan, device overview and agreed failure tests.

Good to know

Your questions. Clear answers.

Which UniFi switch is suitable for a small office?

The Lite 8 PoE can fit few Gigabit and PoE devices. If faster ports or more PoE performance are required, other equipment may be considered. The decisive factors are the connected devices and the planned reserve.

Can I operate twelve UniFi switches as a stack?

The ECS-S planning provided here uses a maximum of four devices per stack. Twelve access switches are therefore planned as three stacks of four. The model, software version and cabling must support the required functions.

Are all UniFi switches stackable?

No. Shared management in UniFi Network does not automatically mean stacking. The stack functions described refer to suitable ECS-S devices. Pro Max switches in our office examples are managed individually.

Does a VLAN automatically secure the network?

A VLAN initially separates logical network areas. The routing, firewall and, if necessary, access control rules determine which communication is permitted between them. We plan and test these rules together.

Are optics, cables and equipment included in the guide price?

The CHF guide prices shown refer to the hardware described. Required optics, cabling, accessories, installation and support will be shown separately in your offer unless expressly included. The exact price is available upon request.

Irontec customer references

These customers use UniFi.

Companies and organisations using Ubiquiti UniFi with Irontec. The labels indicate which customers also use UniFi Protect.

Irontec References

Insights into our customer projects.

A selection from the areas of web, collaboration and digital customer acquisition. Discover the implementation in the published project reports.

Financial Services

Zellweger Group AG

Website and collaboration connected.

Irontec relaunched the website and created a digital sales channel. The project also included Microsoft 365 with shared files and mailboxes, training and a peoplefone VoIP solution.

  • Web design
  • Microsoft 365
  • peoplefone
  • Online marketing
Read project report

Engineering

Gartenmann Engineering AG

A new appearance for complex projects.

The project report describes the website relaunch with workshops, responsive implementation and search engine optimization. An individually developed reference function enables PDF creation from selected projects.

  • Web design
  • Reference representation
  • SEO
Read project report

Advice

apbp consulting GmbH

From the foundation to the digital workplace.

The website, logo and corporate identity were created together with a Microsoft-365 environment. Email, shared file storage and training supported collaboration across different work locations.

  • Web design
  • Branding
  • Microsoft 365
Read project report

Training

Fahrschule Luan

Be found online. Simply register.

Irontec implemented a responsive website with contact and course registration. In addition, target groups and search terms were developed and four Google Ads campaigns were set up and optimized.

  • Web design
  • Google Ads
  • Course registration
Read project report

The project reports document the scope of services at that time.

Your next step.
A good conversation.

Tell us what you're up to. We think along.

Get to know without obligation